Parallax Aerial GVC · CAA Authorised · £10m PL

Construction progress monitoring · Slough · Berkshire · M4 corridor

The same flight, every month.

Nadir grid flown to a saved mission, so month three is directly comparable to month one. A dated site record for progress meetings and programme evidence — orthomosaic, labelled stills and a month-to-month pair, on your desk by the third working day of the month, before your progress meeting.

Cinematic and FPV still available — see the reel

On your desk
3rd working dayof the month · 48 h from a flight
Output
Orthomosaic JPGlabelled stills · PDF pack
Typical
£400–£650per site, per month
Base
Slough, Berkshire1 hour travel included
01

The same mission, flown twice

Two real captures of the same site, flown to the same saved mission. Drag the divider. The two dates are a day apart, not a month — what is being demonstrated here is that the flight repeats, which is the part a monthly record depends on.

Drag · or use arrow keys
Orthomosaic of Ramblers Car Park on 3 August 2026, the baseline capture — a 3.88 hectare woodland car park seen from directly above, assembled from 226 aerial frames.
Baseline · 3 Aug 2026 · 226 frames
Orthomosaic of the same site on 4 August 2026, flown to the same saved mission.
Repeat · 4 Aug 2026 · 228 frames
◀ 3 Aug 2026 · baseline Demonstration capture · Ramblers Car Park · not client work 4 Aug 2026 · repeat ▶

Both captures reproduced line spacing to within 2 cm (16.57 m and 16.43 m), on identical bearings, at the same 40 m altitude, with gimbal, ISO, shutter and white balance fixed. Both orthomosaics are rendered on one shared grid at 0.105 m/px, so the divider above compares like with like rather than two independently-framed maps. The site is 3.88 ha and the source orthomosaics are 2.0 cm/px, downsampled here for the comparison. A visual record, not survey-grade.


02

What's in a progress pack

Seven items, the same seven every visit, flown to the same mission file. Nothing on this list depends on kit I don't own.

On your desk by the 3rd working day
  1. Nadir grid over the full site footprint, 70% side / 80% forward overlap
  2. Fixed N/E/S/W obliques flown from four marked positions
  3. Orthomosaic overview — visual record, not survey-grade
  4. 15–30 labelled stills — key elevations and whole-site
  5. Side-by-side comparison against the previous visit
  6. Cover sheet: site, date, weather, flight reference, visit number
  7. A PDF pack, built within 48 hours of a successful flight and with you by the third working day of the month

Where it lands is your choice. The pack goes into your Procore, Autodesk Construction Cloud, SharePoint or Dropbox folder, filed under the visit date — not as an attachment in my email for someone to re-file. Tell me the folder at the first visit and it goes to the same place every month.

Two pages from the delivered PDF pack: the cover sheet, and the survey details and accuracy statement.
Pack spread · Cover and accuracy statement · Ramblers Car Park, 4 Aug 2026

Download the sample · PDF, 6 pages, 15 MB

This sample comes from a demonstration flight that was nadir-only, so it carries five of the seven — the capture record, the orthomosaic, the month-to-month comparison, the cover sheet and the turnaround, plus a surface model. The obliques and the labelled stills need an oblique flight to produce and are not in it.


03

What you receive, and what it costs

Every price carries a unit and a scope. The two rows marked hired kit are real services quoted per job — they are not flown on my own aircraft, and I don't price them as though they were.

Ex VAT · travel included within 1 hour

Scroll the table sideways →

JobFlown asYou receiveStated accuracyTypical price
Construction progress pack Nadir grid flown to a saved mission, plus obliques from four marked positions Orthomosaic JPG, 15–30 labelled stills, month-to-month pair, PDF pack Visual record, not survey-grade £350–£500 one-off
£400–£650 per site per month
Roof & building inspection Manual obliques and close passes, no contact Labelled 4K stills + PDF defect sheet, numbered and located on a plan Visual condition record, not a structural survey From £300 per building
one visit
Site overview & marketing stills Obliques + panorama Graded stills, optional short cut From £300 per site visit
Topographic survey / stockpile volumesHired kit Hired RTK aircraft + ground control GeoTIFF, point cloud, DXF linework, written accuracy statement Quoted per job with the accuracy spec attached POA
Thermal / solar inspectionHired kit Hired thermal payload Radiometric imagery, per-panel fault map Quoted per job POA

Send a site address and roughly how big it is and the reply is a price, not a question. Monthly work is booked as a standing visit, not a contract you can't leave.


04

"Why not just get the site engineer to fly it?"

Fair question, and worth answering properly. Someone on site with a Mavic will get you photographs. What they will not get you is a comparison — and the comparison is the whole product.

Ask it early · it decides the spend
The flight is a file, not a decision
Every visit flies the same saved mission — same lines, same heights, same camera angles. On the two dates measured, the flown line spacing repeated to within 2 cm, checked out of the image metadata afterwards rather than assumed. Fly it by hand and the geometry is different every month, so the two maps never quite line up and the comparison quietly stops meaning anything.
Each month is tied back to the first
Every visit after the baseline is aligned to it before anything is measured. Without that step, GPS drift alone moves the whole site between dates — a metre-scale shift that looks exactly like progress and isn't.
There is a number attached
The agreement between repeat visits is stated in percentiles, measured on a real repeat flight — see below. A phone gallery has no error figure, and in a programme dispute the number is the part that carries weight.
It doesn't come out of your team's week
The CAA authorisation, the £10m public liability, the RAMS, the airspace check and the induction sit with me. So does the morning it takes, the reflight when the weather turns, and the processing. Your site engineer has a programme to run.

The honest version of the trade: if all you need is a picture of the site this week, someone on site with a drone is cheaper and faster, and you should do that. Plenty of sites should.

This is worth paying for when you need this month set against last month, on the same footing, with a date and a method behind it — for a progress meeting, an interim application, or the moment somebody disputes what was built and when. That is a different job, and it is not one a busy engineer with a Mavic can do repeatably.

The same logic decides the other direction: where a job genuinely needs certified volumes or setting-out accuracy, this kit is the wrong tool and I say so — see the section below, and the hired kit rows in the table above.

The part most suppliers leave out

What this kit will and won't tell you

Standard visits fly a DJI Mini 3 Pro. That gives a clean, geometrically consistent visual record — enough for a progress meeting, a programme dispute, a roof condition check, or briefing a client. It is not survey-grade. It will not give you certified volumes or centimetre accuracy, and I won't put a number on a stockpile from it. Where a job needs that, I hire an RTK aircraft, set ground control, and the accuracy statement comes with the file.

Here is mine.

On bare, hard ground, repeat surveys of the same site agree to within 0.24 m for 90% of the surface and 0.31 m for 95%.

Measured on a validation site, 4 August 2026, by flying it twice and comparing. Bare and hard ground only — vegetation and tree canopy are several times worse. Percentiles, not RMS: the error distribution has heavy tails. Change is quoted relative to the baseline survey, never as absolute levels. Not survey-grade, and not for setting out.

The full study — method, the surfaces it does not apply to, and the results that went badly — how accurate is a sub-250 g drone, really?

If a supplier quotes you survey accuracy off a sub-250 g drone, ask them for the accuracy statement.

05

Why month three compares to month one

The reason the comparison holds is procedural, not equipment.

Saved mission, identical waypoints, heights and camera angles every visit. Obliques from four marked positions, flown at the same distances. Visits booked for the same time of day where weather allows, so shadows fall the same way. Same labels, same file naming, month to month.

A site that changes is easy to photograph. A site you can compare needs the flight to stop being a decision.

Who this is for

Main contractor / PM
Monthly progress pack for site meetings and programme disputes — supporting material for interim applications, not a substitute for the QS measure.
QS / commercial
White-label or supporting capture for claims packs and applications — you keep the client relationship.

Two, deliberately. Groundworks, survey practices, quarry operators and FM teams are all worked with and quoted per job — they are on the capability statement — but the monthly progress pack is built around the site team and the commercial team, and it is better for being built around two buyers rather than six.

Safe and legal on a live site

Licence
GVC qualified · CAA authorised for commercial operations
Insurance
£10m public liability, certificate on request
Compliance
Commercial operator cover meeting the CAA's requirement under Regulation (EC) 785/2004
Operator
CAA Operator ID on request
Before
RAMS supplied ahead of the visit; works to your site induction
On the day
Flight window agreed with the site manager
Permission
No flight without written permission
Airspace
Pre-flight check including Heathrow-area and Windsor restrictions

The base sits under Heathrow's controlled airspace and near Windsor restrictions. Knowing exactly where that bites — and where it doesn't — is the difference between a booked visit and a wasted morning. Windsor town and Eton are closed; Slough, Maidenhead and the M4 industrial belt are the working catchment.

Coverage

Base
Slough SL1, Berkshire
Travel
1 hour included; beyond that £20/hr
Areas
Berkshire · Bucks · Slough–Maidenhead–M4 · Surrey · Herts · Greater London
Beyond
By arrangement, travel quoted separately

06

Enough detail here and the reply is a price, not a question.

I read these myself and answer within one working day.

What you send here goes to my inbox via Formspree, which is US-hosted. I use it to reply and to quote, and for nothing else. Privacy notice.

Capability statement

The one-page version for procurement and pre-qualification — read it here.

On file, on request

£10m public liability certificate · EC 785/2004 compliance confirmation · CAA Operator ID · RAMS · GVC certificate.