Parallax Aerial GVC · CAA Authorised · £10m PL

Field notes · Measurement, method and limits

Articles

Working notes from a drone operator who measures his own error. Every number here came off a real flight, and the results that went badly are published with the ones that went well — because the second kind is only worth anything next to the first.

7 Oct 2026
Measurement
~7 min read

The altitude your drone reports is not the altitude it flew

Three flights of the same site, from the same take-off spot, each at an identical 40.00 m above launch — and the absolute altitude the drone wrote into its photos moved 27.78 m in 24 hours. Where that number actually comes from (one figure, settled before take-off), why the weather moves it, what it means for anyone quoting levels off a drone, and how to check your own aircraft in an afternoon.

Read the note →
Above launch, all flights
40.00 m
Absolute drift, 24 h
+27.78 m
Heathrow pressure
−3 hPa
Change after alignment
0.063 m
9 Aug 2026
Measurement
~10 min read

How accurate is a sub-250 g drone, really?

Almost every operator in this market claims "accurate to 2 cm" and almost none of them have flown the same site twice to check. I did: the same car park, the same saved mission, 24 hours apart, with nothing changed in between — so everything the model reported was error. The result, the method, the surfaces it does not apply to, and the three findings that don't flatter the kit, including a volume over-read of 2.7× and an automated change detector that missed a box entirely.

Read the study →
90% within
0.237 m
95% within
0.311 m
Hardstanding scatter
0.033 m
Volume over-read
2.7×

What's coming

Written when the work behind them is done and measured, not before:

  • Correcting the per-flight datum shift — whether 14–24 cm of constant offset can be removed, and what is actually left when it is
  • Volume error at stockpile scale, on something considerably larger than a shoebox
  • What a month of progress packs looks like on a live site, with the client's permission
  • Flying inside the Heathrow zone: where the restrictions bite around Slough, Windsor and the M4, and where they don't

The day job

Monthly construction progress monitoring, from Slough.

The same mission flown every visit — orthomosaic, labelled stills and a month-to-month comparison, on your desk by the third working day, before your progress meeting. Berkshire, Bucks, the M4 corridor and Greater London.